March 2022

F – Frog

 3/14/2022 – 3/27/2022 Mega Lights 2 Demo: https://youtu.be/sEQk2R4pPQM Summary: My objective was to finish routing the Synth PCB and place the order on JLCPCB, then start Planning and Purchasing for Mega Lights 2. I wasn’t sure if I would get delayed from the lights or from the synth, but that didn’t end up happening so as […]

F – Frog Read More »

E – Eagle

2/28/2022 – 3/13/2022 Summary: My goal for this two week block was to finish debugging the breadboard synth, make any design changes necessary, and then route and order the PCB. I got called to go onto a job site though both weeks this sprint so I lost a lot of productive lab time. My 555 Badge

E – Eagle Read More »

D – Dolphin

2/14/2022 – 2/27/2022 Summary: My goal for this two week block was to build out the synth on a breadboard (again) following the KiCAD schematic, to verify that there were no errors or missed connections in the Schematic, that way when I order a board based on that Schematic, the PCB actually works. The Synth

D – Dolphin Read More »